Custom ASRS Archive Storage Modules
Plan an archive storage module around the automated system that will retrieve and place its contents. The system interface and dimensional requirements should lead the design brief.
Review project requirements ↗Storage & carts
Request a storage locker around the items that need controlled access. Large tools, equipment and supplies may need a different opening, interior arrangement or handling method than a standard personnel locker.

Configuration planning
Define the usable interior space and door opening separately from the outside footprint. Include shelf loads, access control preferences and ventilation or environmental requirements. A lockable enclosure is not automatically a fire-rated, weatherproof or hazardous-material storage cabinet.
Technical background and supplier examples: EGA Products Industrial Storage Lockers ↗. Reviewed October 8, 2026.
Custom feasibility, final dimensions, rated loads and required documentation depend on the reviewed configuration. Submitting a quote request does not confirm a completed design or certification.
Only a configuration verified for the required rating should be selected for that purpose. State the material being stored and the required documentation so the supplier can assess the request.
Use the project quote form and include the application, dimensioned drawings, loads, quantity, delivery location and timing. Our team will review the requirements and respond as quickly as possible.
Plan an archive storage module around the automated system that will retrieve and place its contents. The system interface and dimensional requirements should lead the design brief.
Review project requirements ↗Organize supplies or components in a movable module sized for the facility. The storage layout and the movement route should be planned together so access to contents does not conflict with handling the unit.
Review project requirements ↗Bring bins and small components to the point of use on a module planned for the production area. Bin access, replenishment and movement through the facility all affect the layout.
Review project requirements ↗