Custom ASRS Archive Storage Modules
Plan an archive storage module around the automated system that will retrieve and place its contents. The system interface and dimensional requirements should lead the design brief.
Review project requirements ↗Storage & carts
Organize supplies or components in a movable module sized for the facility. The storage layout and the movement route should be planned together so access to contents does not conflict with handling the unit.

Configuration planning
Define the compartments, loading positions and equipment that moves the module. Include aisle and doorway limits, storage locations and any environmental exposure. For forklift handling, specify the interface and the condition in which the module will be moved.
Technical background and supplier examples: EGA Products Portable Storage Modules ↗. Reviewed October 8, 2026.
Custom feasibility, final dimensions, rated loads and required documentation depend on the reviewed configuration. Submitting a quote request does not confirm a completed design or certification.
A mixed compartment layout can be evaluated from the item dimensions and loads. Include how each compartment is loaded and accessed so the supplier can review the complete module.
Use the project quote form and include the application, dimensioned drawings, loads, quantity, delivery location and timing. Our team will review the requirements and respond as quickly as possible.
Plan an archive storage module around the automated system that will retrieve and place its contents. The system interface and dimensional requirements should lead the design brief.
Review project requirements ↗Request a storage locker around the items that need controlled access. Large tools, equipment and supplies may need a different opening, interior arrangement or handling method than a standard personnel locker.
Review project requirements ↗Bring bins and small components to the point of use on a module planned for the production area. Bin access, replenishment and movement through the facility all affect the layout.
Review project requirements ↗