Build the packing station around the package and the sequence of work. A custom bench can organize the work surface, packaging supplies and frequently used tools within the space available at shipping or receiving.
EGA Products supplier example. The photographed arrangement is not a Factory Equipment installation or a confirmed design for your project.
Configuration planning
Define the arrangement before selecting the equipment.
Map where products arrive, how cartons are formed and where completed packages leave. Include printers, scales, electrical equipment and consumable storage in the brief. The equipment supplier can then review surface dimensions and storage positions without guessing how the station will be used.
Work-surface footprint aligned with package sizes
Supply and tool storage positioned for the process
Custom feasibility, final dimensions, rated loads and required documentation depend on the reviewed configuration. Submitting a quote request does not confirm a completed design or certification.
Questions about custom shipping and packaging benches
Can a packing bench include equipment and supply storage?
Those requirements can be included in the design brief. List the equipment dimensions, loads and access needs so the supplier can evaluate mounting, shelving and utility provisions.
How do I request custom shipping and packaging benches?
Use the project quote form and include the application, dimensioned drawings, loads, quantity, delivery location and timing. Our team will review the requirements and respond as quickly as possible.
Reach the service points that a standard rectangular platform misses. A custom maintenance platform starts with the machine outline, the work being performed and the access needed around each service location.
Bring workers closer to large assemblies with a platform planned around the build sequence. The important dimensions change as parts are added, tools move and the assembly advances through the work station.
Connect an elevated work area with stairs and landings sized for the building and the job. Start with the finished rise and the available horizontal run, then map the route into and out of each landing.