Custom ASRS Archive Storage Modules
Plan an archive storage module around the automated system that will retrieve and place its contents. The system interface and dimensional requirements should lead the design brief.
Review project requirements ↗Storage & carts
Bring bins and small components to the point of use on a module planned for the production area. Bin access, replenishment and movement through the facility all affect the layout.

Configuration planning
Specify the bin dimensions and the load in each position rather than providing only a total cart load. Include the replenishment direction and the space operators need to remove contents. The cart's width, handles and casters must also suit the route between storage and the workstation.
Technical background and supplier examples: EGA Products Portable Bin Cart Modules ↗. Reviewed October 8, 2026.
Custom feasibility, final dimensions, rated loads and required documentation depend on the reviewed configuration. Submitting a quote request does not confirm a completed design or certification.
State whether bins are supplied, required with the module or selected separately. Provide their dimensions and loaded weights so the fit and support arrangement can be reviewed.
Use the project quote form and include the application, dimensioned drawings, loads, quantity, delivery location and timing. Our team will review the requirements and respond as quickly as possible.
Plan an archive storage module around the automated system that will retrieve and place its contents. The system interface and dimensional requirements should lead the design brief.
Review project requirements ↗Organize supplies or components in a movable module sized for the facility. The storage layout and the movement route should be planned together so access to contents does not conflict with handling the unit.
Review project requirements ↗Request a storage locker around the items that need controlled access. Large tools, equipment and supplies may need a different opening, interior arrangement or handling method than a standard personnel locker.
Review project requirements ↗